Floor tile installation
Porcelain, ceramic and large-format floors laid flat, square and built to last.
Every floor starts with the substrate. We check flatness and deflection, fix what needs fixing, then set your tile with the right mortar and trowel for its size.
What's included
- Layout planned around doorways and focal points
- Thinset, grout, spacers and leveling clips
- Spot leveling up to 1/4"
- Clean-up and haul-away
What's included
- Layout and mock-up before setting
- Large-format leveling systems
- Uncoupling membranes for wood subfloors
- In-floor heating
Our process
-
1
Consultation
We visit, measure and talk through tile, layout and budget.
-
2
Quotation
You get a written quotation with scope, exclusions and timeline.
-
3
Preparation
Demolition, substrate repair and waterproofing.
-
4
Installation
Tile setting, grouting, sealing and final walkthrough.
Questions about Floor tile installation
Do you supply the tile?
Either way. We can supply tile at an allowance or install tile you have bought.
How long does it take?
Most bathrooms take 4–7 working days including waterproofing cure times.
Ready to start your tile project?
Get an instant online estimate in minutes, then request a detailed written quotation.